The most expensive kitchen mistakes happen when appliances are chosen after the cabinets are built: an oven that doesn't fit its opening, a duct that has to snake around a beam, a socket in the wrong place. Settle these twelve decisions first and give the details to your carpenter, plumber and electrician.
01Hob type: gas, induction or both
Gas is the everyday choice in most Pakistani homes; induction is fast, clean and safe, but needs a suitable power supply. Some families combine a gas hob with a small induction or ceramic domino plate for backup.
02Hob size and number of burners
Count how many pots you usually have going at once. Two or three burners suit small households; four or five suit large families and frequent entertaining.
03Hob cut-out size
Every built-in hob has an exact countertop cut-out. Get it from the model's specifications before the stone is cut — stone cannot be made smaller again.
04Hood style and width
Side-draft, slant, extra-wide chimney or island? Choose a hood at least as wide as the hob. Our hood buying guide helps you decide.
05Duct route
Plan where the duct leaves the kitchen. Shorter and straighter is better. Leave space above the cabinets or in the ceiling for it.
06Built-in oven position
Under the counter, or at eye level in a tall unit? Note the oven's cabinet opening size and ventilation gap, and plan the power point behind or beside it.
07Microwave or combi oven
A built-in microwave can sit above the oven in the same tall unit. If space is tight, a combination oven can replace both.
08Dishwasher
A built-in dishwasher needs a 60 cm or 45 cm space next to the sink; a sink dishwasher replaces the sink itself. Either way, plan the water inlet, drain and power point.
09Water purifier
Most purifiers sit under the sink with a small tap on the counter. Keep space under the sink and a power point if the model needs one.
10Refrigerator
A built-in refrigerator such as the Fotile F20 needs an exact tall-unit opening; a freestanding fridge needs breathing space at the sides and back. Decide before the tall units are made.
11Gas line and power points
List every appliance with its gas or power needs and mark the positions on the plan for your plumber and electrician. Add a few extra sockets on the counter for small appliances.
12Delivery and installation timing
Order appliances in time to have their exact sizes during cabinet making, and book installation for when the counters and tiles are finished. Buying from an authorised seller means the installation, warranty and service are all covered.
Get your sizes in one message
Put the models you like in the Quote Basket and send it. We'll reply with prices plus the cut-out and cabinet sizes your carpenter needs.